Training Within Industry: Documents and training
- TWI Job Instruction — Original Course Materials and Forms
The complete TWI Job Instruction course set: instructor's guides for all five sessions, the JI pocket card, the Session 1 participant handout, the job breakdown sheet, the observation check sheet, and the team training matrix.
- TWI Job Methods — Original Course Materials and Forms
The complete TWI Job Methods course set: the four-step JM pocket card, the job breakdown sheet, a sample worksheet, and the trainer's outline for each of the five sessions of the program.
- TWI Job Relations — Original Course Materials and Forms
The complete TWI Job Relations course set: the JR pocket card, trainer's outlines for all five sessions, the problem analysis sheet, and the standard debrief procedure for supervisor practice problems.
- Isao Kato on TWI's Influence on TPS and Kaizen
Summary notes from a February 2006 interview with Isao "Ike" Kato, known inside Toyota as the father of the standardized work and kaizen courses and a master instructor of TWI material. Kato recounts TWI's introduction at Toyota (Job Instruction December 1951, Job Methods June 1952, Job Relations March 1953), explains why Ohno replaced JM with Shingo's P-course, traces the development of the standardized work and kaizen courses, and argues JI had the biggest impact on TPS while rejecting the claim that TWI is the overall root of lean.
- Introduction to TWI
- Roots of Lean and TWI
- TWI Summit 2008
- Teaching the Work — Toyota Job Instruction (TJI)