Art of Lean
← Just-in-Time

Just-in-Time: Documents and training

  • Connecting Assembly with Batch Processes via Basic Pull Systems

    A practitioner article by Art Smalley, published in Assembly Magazine, on connecting assembly operations to upstream batch processes such as stamping, molding, paint, and machining using replenishment pull with signal kanban. It explains three approaches: pattern production, lot making with a batch board, and triangle kanban, with pros and cons of each, plus a seven-step worked example for sizing lot sizes and trigger points in a machining department.

  • Katsuya Jibiki on the History of Set-Up Reduction at Toyota

    Summary notes from a July 2006 interview with Katsuya Jibiki, who spent 38 years in the Honsha press shop, rising from machine operator in 1958 to division manager. He traces set-up reduction from Ohno-era machine shop improvements through the 1960 Danly quick die change presses at Motomachi and a decade of work on roughly 50 older Honsha presses, with before-and-after changeover times. He also disputes the account of Toyota set-up reduction given in Shigeo Shingo’s SMED book while crediting Shingo with coining the terminology.

  • Toyota Production System and Kanban System (Sugimori, Kusunoki, Cho, Uchikawa, 1977)

    The 1977 International Journal of Production Research paper by four members of Toyota’s Production Control Department, the first major academic description of the Toyota Production System and kanban system in English. It presents cost reduction through waste elimination and full use of workers’ capabilities as the two basic concepts, and explains just-in-time production, withdrawal by subsequent processes, production leveling, jidoka, and the respect-for-human system, including the kanban quantity equation.

  • A Brief History of Set-Up Reduction

    A research essay by Art Smalley examining competing origins of set-up reduction in manufacturing and arguing there is no single inventor. It works through candidate cases in historical order, from Sakichi Toyoda’s G-Type loom and Ohno-era machine shops to Danly quick die change presses, Toyota press shop kaizen, a Toyota do Brasil forging shop, Shigeo Shingo’s SMED, and parallel work at Nissan, drawing on interviews with five retired Toyota managers.

  • Creating Level Pull Summary (Slides)
  • Creating Level Pull Summary (Text)
  • Sample Triangle Kanban Calculations
  • Sample Withdrawal Kanban
  • SMED Steps Overview
  • Tips for a Lean Supply Chain